Boston Street Occupancy Permit Filing and Sign Posting
Reserve curb space for construction, dumpsters, scaffolding, lifts, crane picks, storage containers, and film work. We prepare the Boston Public Works filing, calculate the city fee before checkout, coordinate the required No Parking signs, and post them on schedule.
Get My Street Occupancy Permit$179 service fee. No charge until your permit is approved.
Calculate the Boston city fee first →
Reserving parking for a moving truck instead? See Boston moving parking permits.
Boston Street Occupancy Fees
Boston starts with a $50 city base fee, then adds occupied-area, sign, and meter charges. Our filing and sign-posting service fee is $179.
| Spaces | Days | City fee | Total with service |
|---|---|---|---|
| 1 | 1 | $70.00 | $249.00 |
| 1 | 3 | $102.00 | $281.00 |
| 1 | 7 | $166.00 | $345.00 |
| 2 | 1 | $86.00 | $265.00 |
| 2 | 3 | $150.00 | $329.00 |
| 2 | 7 | $278.00 | $457.00 |
Bonded contact required: Boston requires a bonded company, contractor, or individual account for street occupancy work. Have the bonded contact details ready before you start the application.
What Happens If You Work Without One?
Working without a permit
- × You cannot lawfully reserve the street or sidewalk space for the work
- × The project may be delayed while the required permit is obtained
- × Unpermitted equipment may conflict with parking and traffic controls
- × Neighbors do not receive the City's required advance notice
- × The occupied area is not covered by an approved traffic or police-detail plan
With Easy Moving Permits
- ✓ Permit filed with Boston PWD — legal coverage for your crew and equipment
- ✓ No Parking signs posted before your start date to mark the permitted area
- ✓ Works for construction, dumpsters, cranes, scaffolding, fencing, staging, and filming — year-round
- ✓ Card authorized at checkout, only charged once your permit is approved
- ✓ Flat $179 service fee for filing and sign posting
What We Handle
Boston Public Works street occupancy permits for any work that requires blocking parking.
Permit workflow
From Application to Posted Signs
One route through Boston Public Works, with the filing and required signs handled for you.
-
STEP 01 Details received
Apply Online
Tell us your work type, address, dates, and number of spaces. Takes under 5 minutes.
-
STEP 02 City review
We File With Boston PWD
We submit the permit request. Your card is authorized at checkout and charged only after approval.
-
STEP 03 Signs posted
We Post the Signs
We put up the required No Parking signs before your start date.
Common Questions
What is a Boston street occupancy permit? ▼
Do you handle dumpster permits in the summer? ▼
Do I need a bonded city account? ▼
How far in advance do I need to apply? ▼
How much does a Boston street occupancy permit cost? ▼
How long can I get a permit for? ▼
What work types do you handle? ▼
When is my card charged? ▼
Ready to Get Your Boston Street Occupancy Permit?
Simple online application. $179 flat service fee. No charge until approved.
Get My Permit - Start Application$51 less than other services · Year-round availability · We post the signs